TRITEC skills used on this project
feasibility & concept design
equipment specification & procurement
process control design & build
installation & commissioning
training
Airbus UK (via Hyde Group)
A380 Trailing Edge Wing Assembly Jigs

Initially TRITEC conducted a feasibility study to determine the best control system architecture liaising with the mechanical design team from Hyde Group to achieve the best solution for the automated precision actuators.

TRITEC was responsible for the electrical system design, specifying, sourcing and procuring the components used, as well as the control system software design and screen-based user interfaces.

Installation and commissioning took place over 3 months to very tight timescales and involved installing over 4,000 metres of cable, 8 Display Pedestals and 8 Card readers.

Once the jig was up and working TRITEC provided on-site support during the first aircraft build and then undertook a series of training courses for the electrical and software systems. << back

2

some of our clients


aerospace
Airbus Ltd
British Aerospace


medical
DawMed International
NeoCare


nuclear
British Nuclear Group


industrial
Blolite
Blundell Production Equipment
t: +44 1925 220466
sitemap
Copyright 2011 TRITEC Developments Ltd